Better Project Information

This is an archive version of an article from the CPIc website, which was closed in 2025. CPIc (the Construction Project Information Committee) was formed from representatives of the major industry institutions and was responsible for providing best practice guidance on the content, form and preparation of construction production information.

A great video from the CPI archives, provided by Keith Snook of the BRE (and CPI Committee member).

This clip from a much longer film from the time of the launch of the original CPI documents in 1987 and shows two examples of the consequences of not communicating information effectively through the construction process. Both cases show the correlation between the quality of information delivered to site with the quality of finished work.

“Progress on site was often disrupted by late or inadequate information”

Better project information.jpg

Then and Now

Here’s some comparison shots of the first example in the video (from the Building Research Establishment in Watford) as it stands today, still with the infill detail at the redundant doorway.

Inset dorway then.jpg

Inset Doorway then

Inset dorway now.jpg

Inset Doorway Now

Alternative side door then.jpg

Alternative Side Door Then

Alternative side door now.jpg

Alternative Side Door Now

Last updated: June 1, 2014 at 10:24 am

Designing Buildings Anywhere

Get the Firefox add-on to access 20,000 definitions direct from any website

Find out more Accept cookies and
don't show me this again